MRT lines from Concept Plan 2001
MRT lines from Concept Plan 2001
Existing and under construction
- North South Line
- East West Line
- Changi Airport Branch Line (under construction, full completion in 2002)
- North East Line (under construction, opened on 20th June 2003)
- Bukit Panjang LRT
- Sengkang LRT
- Punggol LRT
Planned and proposed
- Circle Line (completed between 2009-2012)
- Bukit Timah Line (merged into Downtown Line)
- Eastern Region Line (divided into Downtown Line Stage 3 and Thomson East Coast Line Stage 4 and 5)
- Jurong Region Line (upgraded into MRT system, scheduled opening between 2027 and 2029)
- Thomson Line (merger with lower half of Eastern Region Line to form the Thomson East Coast Line)
- North Shore Line (incorporated into the Cross Island Line Punggol Extension)
- Seletar Line (announced in 2019, finalized in 2025 COS debate)
- Tengah Line (then known as Holland Line, announced in 2025 COS debate)
River Valley LRT (Cancelled)Tampines LRT(Cancelled)Tuas LRT(Cancelled)Toh Payoh LRT(Cancelled)Bedok LRT(Cancelled)Yishun LRT(Cancelled)
Proposed extensions to existing lines
- Boon Lay Extension (opened 2009)
- Tuas West Extension (opened 18 June 2017)
- North South Line Extension (opened November 2014)
- Circle Line Stage 6 (opening from 2026)
- Circle Line Downtown Extension (merged into Downtown Line as Stage 1)
- Downtown Line 3 Extension (proposed as part of Eastern Region Line, opening in 2026)
- Downtown Line 2 Extension (proposed as part of Bukit Timah Line, opening in 2035)
- Cross Island Line Punggol Extension (as part of North Shore Line)
Punggol LRT North Branch (cancelled)